Sign In | Join Free | My benadorassociates.com
China XIAN ATO INTERNATIONAL CO.,LTD logo
XIAN ATO INTERNATIONAL CO.,LTD
Always Terrific Offer
Verified Supplier

6 Years

Home > Drilling Rig Drawworks >

Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations

XIAN ATO INTERNATIONAL CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations

Brand Name : ATO

Model Number : JC40DB, JC50DB, JC70DB

Certification : API Spec.8A/8C and industry standards of SY/T5530

Place of Origin : China

MOQ : 1sets

Payment Terms : T/T, L/C

Supply Ability : 4sets/month

Delivery Time : 45 work days

Packaging Details : Wooden box

Contact Now

Product Description:

The Drilling Rig Drawworks is a critical component in the operation of modern drilling rigs, serving as the primary hoisting mechanism that ensures the safe and efficient handling of drill strings and other heavy equipment. As an essential part of the rig’s hoisting system, the Drawworks integrates advanced engineering and robust construction to deliver reliable performance in demanding drilling environments. This product is designed to meet the rigorous requirements of the oil and gas industry, providing operators with the confidence needed to conduct drilling operations smoothly and safely.

At the heart of the Drawworks is the Rig Drawworks Hoisting Unit, a powerful assembly that converts mechanical power into controlled hoisting force. This unit is engineered for precision and durability, featuring high-torque motors and heavy-duty braking systems that ensure accurate control over load movement. The Rig Drawworks Hoisting Unit is capable of handling substantial loads, making it suitable for a wide range of drilling applications, from shallow wells to deepwater exploration projects. Its design incorporates fail-safe mechanisms and redundant safety features to minimize the risk of accidents during the hoisting process.

Integral to the Drawworks system is the Drilling Rig Hoist Drum, which plays a vital role in managing the drilling line. This drum is constructed from high-strength materials to withstand the severe stress and wear associated with continuous cable winding and unwinding operations. The Drilling Rig Hoist Drum is precision-engineered to provide smooth and consistent cable management, reducing the likelihood of cable damage and ensuring operational longevity. Its large diameter and optimized groove design facilitate efficient cable handling, which is crucial for maintaining steady drilling progress and preventing downtime.

The Drilling Rig Cable Winch function embedded within the Drawworks further enhances the rig’s operational capability. This winch system is responsible for spooling and controlling the drilling cable, enabling the raising and lowering of the drill string with exceptional control and responsiveness. Equipped with advanced control systems, the Drilling Rig Cable Winch allows for variable speed operation and precise tension management, which are essential for adapting to changing drilling conditions and ensuring the integrity of the drill string. Additionally, the winch’s robust construction ensures reliable performance even in harsh environments, including offshore platforms and remote drilling sites.

Designed with operator safety and ease of maintenance in mind, the Drilling Rig Drawworks incorporates ergonomic controls and accessible component layouts. This facilitates quick inspections, routine maintenance, and rapid troubleshooting, thereby minimizing rig downtime and enhancing overall productivity. The modular design approach also allows for customization and upgrades, enabling operators to tailor the Drawworks to specific project needs and technological advancements.

In summary, the Drilling Rig Drawworks is an indispensable piece of equipment that integrates the Rig Drawworks Hoisting Unit, the Drilling Rig Hoist Drum, and the Drilling Rig Cable Winch into a cohesive and highly efficient hoisting system. Its robust construction, advanced features, and safety-oriented design make it a preferred choice for drilling operations worldwide. Whether deployed in onshore or offshore environments, this Drawworks product delivers the performance, reliability, and control required to support the demanding tasks of modern drilling rigs, ensuring successful and safe drilling operations.


Features:

  • High-performance Drilling Rig Hoist Drum for efficient load handling
  • Durable and reliable Drilling Rig Wireline Winch integration
  • Robust construction ensuring long service life under harsh drilling conditions
  • Precision control system for smooth and safe operation
  • Compact design to fit various drilling rig configurations
  • Advanced braking system for enhanced safety during drilling operations
  • Easy maintenance and quick replacement of critical components
  • Optimized power transmission for maximum efficiency
  • Customizable options to meet specific drilling requirements
  • Compliant with industry standards and safety regulations

Technical Parameters:

Product Name Drawworks Hoisting Mechanism
Type Oilfield Drilling Drawworks
Rated Load Capacity 500 kN
Drum Diameter 1.8 m
Drum Width 1.5 m
Motor Power 200 kW
Brake Type Hydraulic Disc Brake
Hoisting Speed 0-40 m/min
Control System Electronic Control
Weight 4500 kg

Applications:

The ATO Drilling Rig Drawworks, available in models JC40DB, JC50DB, and JC70DB, is an essential component designed for demanding oilfield operations. Certified under API Spec.8A/8C and compliant with industry standards of SY/T5530, this product ensures reliable performance and safety in various drilling scenarios. Originating from China, the ATO Drawworks is manufactured with precision to meet the rigorous requirements of modern drilling rigs.

One of the primary application occasions for the ATO Drilling Rig Drawworks is in the deployment of Drilling Rig Cable Winch systems. These winches are crucial for the controlled movement and positioning of heavy drilling equipment and drill pipes, ensuring smooth operation and minimizing downtime. The drawworks provide the necessary hoisting power and brake control, making it indispensable in the Drilling Rig Hoisting System for lifting and lowering the drill string and other tools within the borehole.

The Oilfield Drilling Drawworks from ATO is particularly suited for use in onshore and offshore drilling platforms where robust and dependable hoisting mechanisms are vital. It is designed to handle heavy loads and withstand harsh environmental conditions commonly encountered in oilfield drilling scenarios. With a supply ability of 4 sets per month and a delivery time of 45 working days, customers can rely on timely availability and consistent quality.

Packaging is handled securely in wooden boxes to ensure the product reaches the site without damage. The minimum order quantity is set at 1 set, accommodating both small-scale operations and large drilling projects. Payment terms are flexible, supporting T/T and L/C options to facilitate smooth transactions globally.

In summary, the ATO Drilling Rig Drawworks is ideally applied in the construction and maintenance of Drilling Rig Cable Winch systems and Drilling Rig Hoisting Systems, playing a critical role in the efficiency and safety of Oilfield Drilling Drawworks operations. Its certification, robust design, and reliable supply chain make it a preferred choice for drilling engineers and operators worldwide.


Support and Services:

Our Product Technical Support and Services for the Drilling Rig Drawworks are designed to ensure optimal performance and reliability throughout the lifecycle of your equipment. We provide comprehensive assistance including installation guidance, routine maintenance, troubleshooting, and repair services. Our team of experienced technicians is available to support you with expert advice, on-site service, and remote diagnostics to minimize downtime and maximize productivity.

We offer tailored training programs to equip your personnel with the necessary skills to operate and maintain the drawworks safely and efficiently. Additionally, we supply genuine spare parts and upgrade kits to enhance the functionality and extend the service life of your drilling rig drawworks.

Our commitment to quality and customer satisfaction means that you receive timely and effective solutions backed by industry-leading expertise. Whether you need preventive maintenance plans, emergency support, or consulting services, our dedicated support team is ready to assist you every step of the way.


Packing and Shipping:

The Drilling Rig Drawworks is carefully packaged to ensure maximum protection during transportation. Each unit is securely placed in a custom-fitted wooden crate with shock-absorbing materials to prevent any damage from impacts or vibrations. Additional waterproof wrapping is applied to safeguard against moisture and dust.

For shipping, the Drawworks is handled by experienced logistics partners specializing in heavy equipment. The packaging is clearly labeled with handling instructions and weight details. Depending on the destination, the product is shipped via sea freight, air freight, or land transport, ensuring timely and safe delivery to the customer’s site.


FAQ:

Q1: What brand and models are available for the Drilling Rig Drawworks?

A1: The Drilling Rig Drawworks is available under the brand name ATO, with model numbers JC40DB, JC50DB, and JC70DB.

Q2: Does the Drilling Rig Drawworks comply with any industry certifications?

A2: Yes, it is certified according to API Spec.8A/8C and meets the industry standards of SY/T5530.

Q3: Where is the Drilling Rig Drawworks manufactured?

A3: This product is manufactured in China.

Q4: What is the minimum order quantity and payment terms for purchasing the Drilling Rig Drawworks?

A4: The minimum order quantity is 1 set. Payment terms accepted are T/T (Telegraphic Transfer) and L/C (Letter of Credit).

Q5: What is the supply capacity and delivery time for the Drilling Rig Drawworks?

A5: The supply ability is 4 sets per month, and the delivery time is typically 45 working days.

Q6: How is the Drilling Rig Drawworks packaged for shipment?

A6: The product is securely packaged in a wooden box to ensure safe delivery.


Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations

Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations

Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations


Product Tags:

Heavy Duty Drilling Rig Drawworks

      

Superior Load Handling Drawworks Hoisting Mechanism

      

Enhanced Safety Controls Oilfield Drilling Drawworks

      
Quality Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations for sale

Heavy Duty Drilling Rig Drawworks with Superior Load Handling and Enhanced Safety Controls for Rig Operations Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: XIAN ATO INTERNATIONAL CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)